Week 24th - 30th April 2020

  1. Changed slider to buttons in Tab 2 - Identified Victim Panel
  2. Fixed bugs and optimized the code to reduce latency in network calls and rendering images
  3. Built the website
  4. Drafted the design document
  5. Recorded and edited the videos

Week 4th - 23rd April 2020

  1. Create a website for the project.
  2. Completed the flow from Victim History UI panel to Information Panel.
  3. Modify the Victim Page UI to better display the IP Address and change some codes.
  4. Start Editing the Design document of the project.

Week 3rd - 16th April 2020

  1. Created History UI panel and integrated with the backend.
  2. Created and Modified Identified Victim UI panel and integrated with the backend.
  3. Modified the ActionsPage with Loading Spanning and added the function of identifying a victim, the MainDataController also was editted with extra notifications.
  4. Solved major exceptions and errors while integrating different pages.

Victims Page:

  1. Create the Victims Page Controller to control the button onhold event and show the active victims into the Victims Page with a scroll to display the latest three victims.
  2. Create the Action button event to jump to Action Page to perform specific actions to the target victim.